Quality workflow
Quality begins before the build is released.
A disciplined workflow connects design intent, process planning, finishing, inspection, and shipment without implying controls that were never scoped.
Control sequence
Four gates from requirement to release.
The workflow stays visible so engineering teams know what is being reviewed and when decisions need to be made.
- Gate / 01
Requirement review
Confirm revision, quantity, process, finish, critical features, and the operating context before release.
- Gate / 02
Build planning
Review geometry, orientation, nesting, and known process risks with the requested outcome in view.
- Gate / 03
Post-processing
Clean, finish, and prepare the parts to the agreed scope while preserving critical interfaces.
- Gate / 04
Release check
Complete the agreed visual and dimensional checks, confirm count, and prepare the order for shipment.
Release definition
Define what matters before production starts.
Inspection depth and documentation should follow the part risk, not a generic promise applied to every order.
- Revision01
- The approved file and change state
- Critical features02
- Dimensions and interfaces that drive fit
- Finish03
- Surface and post-process expectations
- Evidence04
- Inspection or documentation agreed before build
Quality planning
Put critical requirements in the build plan.
Share the file, revision, interfaces, finish, and inspection needs so the production and release path can be scoped clearly.
